Historia de Oller Abogados
Saludo del equipo Oller Abogados
Let's Talk Hablemos
Swipe

Costa Rica.

Small Country

Big Heart.

Like us.

Oller Abogados
Let's Talk

Date

November 11th

Author

Roberto Esquivel

Roberto Esquivel

US$770 Million. 55 Kilometers. And the Clock Is Already Running.

US$770 Million. 55 Kilometers. And the Clock Is Already Running.

Roberto Esquivel

Date

November 11th

Author

Roberto Esquivel

And the Clock Is Already Running.

A few months ago, the San José–San Ramón corridor was a line in our catalog of Costa Rica’s public works.

It was in the structuring stage. Financing had been secured: Law No. 10.682, signed in April 2026, ratified the funding from CABEI and the OPEC Fund. Tender terms were still being prepared.

On October 21, 2026, Costa Rica published the international open tender for the expansion of National Route 1 between San José and San Ramón.

The bidding period is open, and the clock is running.

The size of the opportunity

This is a project of national scale:
US$770 million estimated budget
55 kilometers of National Route 1
Two contract lines and six functional units
Procurement under CABEI (Central American Bank for Economic Integration) policies, with international promotion

The contract follows a turnkey model covering design, construction and maintenance. Its scope includes:
16 interchanges
14 new bridges
15 return points (U-turns)
20 pedestrian bridges
4.5 km of the Río Segundo radial road
Complementary Works

For engineering, construction and supervision firms, and for consortia that combine their strengths, this is one of the most significant road tenders in the region.

Bid submission is currently scheduled for about six months from now. Extensions are common, but no company can plan around one. For an international bid of this size, with consortia to form, documents to legalize and experience to certify, preparation normally takes longer than the time available. Companies that start now are already catching up.

According to the tender information published so far, participants must meet four core conditions:

Legal incorporation: be legally established in their country of origin
Experience: have completed road infrastructure projects of similar scale
Financial capacity: show solvency consistent with the estimated contract value
Technical team: have qualified personnel that meet the tender specifications

Behind each condition there are practical questions. How should the consortium be structured? Which foreign documents must be legalized or apostilled, and how long will that take? How should prior experience be documented so it is accepted? Which local requirements apply to the team and to operating in Costa Rica?

Companies that answer these questions early can focus on what matters: building a competitive bid.

A few months ago, this project was a promise. Today, it has a budget, a defined scope and a schedule.

At Oller Abogados, we advise international companies on Costa Rica’s public procurement, infrastructure and foreign investment. We help them prepare, structure their participation and bid with legal certainty.

If your company, or a client you advise, is considering this tender, now is the time to talk.

Roberto Esquivel

Our greatest virtue is to be an integral ally. I transform regulatory and contracting challenges into tools that ensure the success of each project.

Roberto Esquivel

You Might Also Like

VIEW ALL ARTICLES

November 11th

2026

From Auction to Signing, Without Ever Setting Foot in Costa Rica

Read

Roberto Esquivel

November 11th

2026

First in Central America: Costa Rica Opens a New Chapter in Digital Trade

Read

Roberto Esquivel

Contacto

Some Relevant Links

Del tren al Pacífico 100 metros norte y 25 metros este sobre avenida 18, calle 2, San José, Costa Rica

Contacto